Clarence landscape

Clarence

Operation By Centennial: 85% share (joint venture with SK Energy Australia Pty Ltd)

 

Commercial operations:

Acquired by Centennial in 1998

Location:

Western Coalfields near Lithgow, NSW

Mining Method:

Underground (Continuous Miner)

Markets:

Domestic and Export - thermal coal

Status:

Operational

Coal extracted in 2011:

2 million tonnes per annum

Full production capacity:

2.5 million tonnes per annum

Remaining coal reserves:

46.7 million tonnes - equivalent to 20 years

Transportation:

Rail to Port Kembla, road to domestic customers

Infrastructure:

Coal Preparation Plant, Water Treatment Plant

Main Content

Clarence operates an underground coal mine; a coal handling and preparation plant (CHPP) and water treatment plant in the Western Coalfields of NSW near Lithgow.

2011 was a record year, with production exceeding 2 million tonnes of ROM coal for the first time using the partial extraction method of mining.

Clarence is at the forefront of Australian mining innovation, utilising Australia’s first JOY 4th Generation Flexible Conveyor Train (FCT) high capacity continuous coal haulage mining system. The FCT is a 110 metre tracked conveyor system that bends around corners while conveying coal to an underground, stationary coal receival hopper before being transported to the surface. An operator steers the FCT up or down the panel roadways with a radio remote control. As the FCT does away with conventional shuttlecars, it enables a significant increase in cutting time as the continuous miner unit no longer has to wait for returning shuttlecars.

Environmental Management is at the core of Clarence’s Operations. The mine’s Environmental Management System (EMS) ensures performance against all approvals and licence conditions and facilitates continual improvement.

Community Consultative Committee (CCC) meetings at Clarence are held quarterly to provide a forum for open discussions between representatives of Clarence, the community and other stakeholder’s on issues directly relating to the mine’s operation and environmental performance. In 2011 Clarence participated in a number of community activities including the Save Our Swamps Program and in 2012 has seen contributions to the Clarence-Dargan Rural Fire Service.

Development and Environment Approvals

The following document(s) relate to the mine’s operating and licence conditions.

The Minister for Planning approved the Development Consent for the Clarence Colliery Lease Extension on December 19, 2005. A copy of the Instrument of Consent can be found below.

View all Clarence/Development and Environment Approvals documents

Environment Management Plans

Approvals obtained to facilitate mining generally require management plans in consideration of various identified environmental impacts. These plans vary from operation to operation to reflect the operating conditions.

Environmental Management Plans are required under Clarence’s various approval and licence conditions and form part of Clarence’s Environmental Management System (EMS). Management plans are developed and approved in consultation with the relevant government stakeholders.

View all Clarence/Environment Management Plans documents

Subsidence Management Plans

Subsidence Management Plans (SMPs) are prepared by mining lease holders to consider the potential impacts of underground mining and identify measures to manage such impacts. SMPs may contain requirements for the avoidance of damage to particularly significant features, the mitigation of damage, or rehabilitation of subsidence related impacts.


End of Year Subsidence Reports

This is an annual report that includes a summary of subsidence and environmental monitoring results for the year, an analysis of monitoring results against impact assessment criteria and SMP predictions, identifies trends in monitoring results over the life of the activity and describes what actions were taken to ensure adequate management of any potential subsidence impacts.

View all Clarence/End of Year Subsidence Reports documents

Subsidence Management Plan Approvals

View all Clarence/Subsidence Management Plan Approvals documents

Subsidence Management Plans

View all Clarence/Subsidence Management Plans documents

Environmental Assessments

Environmental Assessments (EAs) are an assessment of the environmental, social and economic benefits and impacts of a proposed project or modification to an existing project. EAs are regulated by the NSW Department of Planning and Infrastructure.

There are currently no documents

View all Clarence/Environmental Assessments documents

Community Consultation


Community Consultative Committee Minutes

A Community Consultative Committee (CCC) provides a forum for open discussion between representatives of the Company, community, council and other stakeholders on issues directly relating to the mine’s operations, environmental performance and community relations, and keeps the community informed on these matters.

View all Clarence/Community Consultative Committee Minutes documents

Complaints Register

The Clarence Community Information Hotline is (02) 6353 8039. A register of community complaints received by the mine can be viewed in the document below.

There are currently no documents

View all Clarence/Complaints Register documents

Newsletters

To find out the latest information from the mine, please view its newsletters.

View all Clarence/Newsletters documents

Environmental Management Reports

An Environmental Management Report is an annual report that consolidates all government reporting requirements relating to the environmental management and rehabilitation of the mine. It contains details on approvals, leases and licences, environmental control strategies, the previous 12 months’ mining and environmental performance and the expected outcome for the following 12 months.


Environmental Management Report

View all Clarence/Environmental Management Report documents

Independent Environment Audit

Independent Environmental Audits are undertaken regularly as a component of each mining approval. The audit is undertaken by a suitably qualified independent expert. The purpose of the audit is to independently assess the environmental performance of the mine and whether it is complying with the relevant requirements of its project approval, any relevant mining lease and environmental protection licence.

A condition of Clarence’s Development Consent Approval requires the mine to commission an independent environmental audit prior to 31 December 2010 and every three years thereafter. Accordingly, the audit was commissioned in December 2010 and completed in February 2011.

Clarence 2011 Environmental Independent Audit

View all Clarence/Independent Environment Audit documents

Environmental Monitoring Data

The following provides a summary of environmental monitoring data undertaken as required by Environment Protection Licences and Approvals. The purpose of this data is to provide the community with meaningful information on the performance of environmental controls.


Environment Protection Licence Monitoring Data

View all Clarence/Environment Protection Licence Monitoring Data documents

Environmental Monitoring Data

View all Clarence/Environmental Monitoring Data documents